Phase 9.5: reconfirmed no canonical commit exists (broader content search across full history — still zero hits outside this session's own commits); Chase confirmed the real document lives on PC #2, unpushed. Not duplicated here per Chase's explicit instruction — he owns bringing it to canonical Gitea. Infisical: Phase 10's 'project does not exist' finding was incomplete, not wrong about what it checked — a proper org-scoped API enumeration (8 projects) still shows no RootNode Academy project visible to the claude-code-migration machine identity, even though Chase confirms it exists. Root cause narrowed to a missing per-project access grant (Infisical scopes identity visibility per-project, separate from org membership) rather than the project not existing. Corrected docs/SECRETS_AND_INFISICAL.md and docs/PHASE10_CANONICAL_STATE_AUDIT.md accordingly, with the exact one-step fix (grant the identity access via Project Settings -> Access) and the identity id needed to do it. No duplicate project was created. Website pricing: a read-only fetch of rootnodeacademy.com found stale founding-price RANGES that don't match the exact fixed V1 prices Chase gave directly this phase; Chase confirmed the fixed prices in this repo's docs are correct and current. Noted as a real discrepancy for his own awareness, not something this repo's scope covers fixing. Updated the Phase 10 launch matrix with a Category column (TECHNICAL READY / OWNER DECISION REQUIRED / EXTERNAL BLOCKER / HARDWARE BLOCKER) distinguishing who needs to act on each remaining gate. No application code changed — audit/documentation reconciliation only.
8.4 KiB
Winter Break Camp — Launch Checklist
The single go/no-go list for opening the Winter Break Linux & Systems Foundations Camp
(docs/WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md Option A) to real public registration. Every
item is tagged COMPLETE, BLOCKED, DECISION REQUIRED, or MANUAL OWNER ACTION —
see docs/PHASE10_LAUNCH_READINESS.md for the full evidence matrix behind each tag. Nothing on
this list is invented by the platform — every non-COMPLETE item is a real decision, asset, or
piece of hardware that has to come from Chase, a legal reviewer, or Stripe, not from more code.
- Canonical repo reconciled — COMPLETE.
docs/PHASE10_CANONICAL_STATE_AUDIT.md: this workstation's HEAD, Gitea'sorigin/main, and every claimed milestone SHA all verified consistent. No stranded branches/tags on the remote. - Second-PC state reconciled — DECISION REQUIRED (verification only, not a code
blocker). Gitea shows no evidence of stranded work, but this session cannot see the other
workstation directly — run the commands in
docs/PHASE10_CANONICAL_STATE_AUDIT.md§1.3 there. Confirmed with Chase (Phase 10.1): the real Phase 9.5 pricing document lives on PC #2, unpushed — bringing that to Gitea would also close this item. - Secrets centralized (Infisical) — MANUAL OWNER ACTION, one step. The "RootNode
Academy" project does exist (per Chase) — Phase 10.1's re-investigation (a proper API
enumeration, not just the CLI picker) found the
claude-code-migrationmachine identity simply isn't listed as having access to it. Grant it access via Project Settings → Access → Machine Identities. Seedocs/SECRETS_AND_INFISICAL.mdfor the exact identity id and the full secret inventory ready to migrate in once granted. - Production server — BLOCKED. Not purchased/provisioned — verified via empty
terraform.tfvars/no state file and placeholdergroup_vars/production.yml. Seedocs/ PHASE10_PRODUCTION_DEPLOYMENT.md. - Production VMs (rn-platform-01 / rn-lab-host-01) — BLOCKED. Depends on the server above.
- Firewall/isolation (code) — COMPLETE.
docs/PHASE10_SECURITY_AUDIT.md— RFC1918 egress denial, mTLS wiring, firewall Ansible role all present and unchanged from Phase 4/ 4.1; cannot be verified against a live host until one exists. - Production database — BLOCKED. Depends on the server above. Migrations themselves reconfirmed idempotent this phase (37/37, both a fresh apply and a same-DB restart).
- DNS (marketing site) / [ ] DNS (Platform API) — PARTIAL.
rootnodeacademy.comis live and real (Cloudflare-fronted, confirmed this phase); no subdomain exists yet for the Platform API itself — needs a real server first. - HTTPS (marketing site) / [ ] HTTPS (Platform API) — PARTIAL, same split as DNS.
- Monitoring (code) — COMPLETE.
/healthz//metricslive and exercised in every regression run this phase; deployment itself needs the production server. - Backups (code) / [ ] Backups (executed) — PARTIAL. Ansible
backuprole exists, never run against a real host. - Restore test — BLOCKED. Never executed — no target exists. A backup that has never been restore-tested does not count as launch-ready.
- Stripe TEST validation — COMPLETE. A real Stripe TEST Checkout Session, a real TEST
payment at the actual $399.00 price, a genuine signed webhook, the existing
registration→enrollment conversion, a real duplicate-delivery proof, a real automated
abandoned-checkout proof, and a real refund with the non-cascade rule reconfirmed — all
proven end to end in Phase 9.1 (
docs/PHASE9_1_STRIPE_TEST_VALIDATION.md). One real defect (webhook-event correlation) was found and fixed as a direct result. - Stripe LIVE configuration — BLOCKED. Not configured, not attempted — requires Chase's own Stripe account business/identity verification (only Chase can do this) plus real LIVE credentials placed in Infisical (blocked on the missing project above), never invented or substituted by this phase.
- Live webhook configuration — BLOCKED. Depends on LIVE credentials and a real HTTPS Platform API endpoint, neither of which exist yet.
- Google Workspace — COMPLETE.
[email protected],gmail.sendscope, domain-wide delegation — validated in Phase 5C (docs/ RUNBOOK_GOOGLE_WORKSPACE_EMAIL.md); deployment to production needs the real server. - Website integration — COMPLETE. Full contract tested end to end, including against real Stripe. The website itself (separate repo, not RootNode-owned) is live and real; this phase did not access or modify it.
- Winter Break price — COMPLETE. $399.00 launch ("Founding Cohort") / $449.00
standard reference, paid in full, no deposit, no payment plan — founder-approved by
Chase directly, validated against real Stripe TEST mode at this exact amount, reconfirmed
current in Phase 10.1. Note:
rootnodeacademy.comitself currently shows different, stale founding-price RANGES (not this fixed figure) — Chase confirmed this repo's price is the correct one; updating the live site is separate, not-RootNode-owned work. - Winter Break dates — DECISION REQUIRED. Chase's call, not invented.
- Venue — DECISION REQUIRED. Chase's call (or confirm fully online/remote), not invented.
- Capacity — DECISION REQUIRED. Chase's call, not invented.
- Agreements (legal text) — BLOCKED.
agreement_definitions.body_summaryremains a plain-language placeholder; no attorney-approved text exists for any required category (program terms, guardian consent, participation waiver, acceptable-use/lab rules, cancellation acknowledgment, privacy notice). Seedocs/PHASE10_LAUNCH_READINESS.mdGate 12 for the full taxonomy — none of it was authored or treated as approved by this phase. - Refund/cancellation policy — DECISION REQUIRED. The platform's mechanical behavior (record, never auto-cascade into registration/enrollment status) is real and proven against actual Stripe money movement; the customer-facing POLICY text is Chase's decision.
- Tax decision — DECISION REQUIRED. No tax treatment is configured anywhere in this codebase (Phase 9's own explicit "no complex tax automation" boundary) — this is not an implicit "no tax owed" determination, it requires Chase or a professional to actually decide.
- Production offering — BLOCKED. Cannot legitimately open registration until dates/
venue/capacity/agreements/refund policy/tax are all resolved — the mechanism itself
(
PATCH /api/admin/offerings/:id, transition toenrollment_open) is ready the moment they are. - Instructor assignment — MANUAL OWNER ACTION. Mechanism ready
(
instructor_offerings); Chase assigns the real instructor once the real offering exists. - Roster process — COMPLETE. Rehearsed end to end (classroom session, real Lab task, instructor visibility) in this phase's dress rehearsal, 13/13.
- Student activation — COMPLETE. Proven real twice — Phase 9.1's real-Stripe run and this phase's deterministic rehearsal.
- Lab capacity (mechanism) / [ ] Lab capacity (real sizing) — PARTIAL. Race-safe capacity logic is proven; real-world capacity planning for actual concurrent students needs the real server's actual specs, unknown until Gate "production server" resolves.
- Complete dress rehearsal — COMPLETE (deterministic). 13/13 this phase, against
current
main. Cannot yet be repeated against the REAL Winter Break offering because that offering cannot legitimately open (dates/venue/capacity/agreements/policy/tax all pending).
Final go/no-go
PHASE 10 PARTIAL / WINTER BREAK LAUNCH BLOCKED
Registration must not open to the public until every BLOCKED and DECISION REQUIRED item above
is resolved. Every COMPLETE item has real evidence behind it, not a self-assessment — see
docs/PHASE10_LAUNCH_READINESS.md's full matrix. Even once every gate above passes, this
platform will not open registration on its own — that action requires Chase's explicit,
separate authorization, given directly, not inferred from a checklist being green.