Phase 9.5: reconfirmed no canonical commit exists (broader content search across full history —
still zero hits outside this session's own commits); Chase confirmed the real document lives on
PC #2, unpushed. Not duplicated here per Chase's explicit instruction — he owns bringing it to
canonical Gitea.

Infisical: Phase 10's 'project does not exist' finding was incomplete, not wrong about what it
checked — a proper org-scoped API enumeration (8 projects) still shows no RootNode Academy
project visible to the claude-code-migration machine identity, even though Chase confirms it
exists. Root cause narrowed to a missing per-project access grant (Infisical scopes identity
visibility per-project, separate from org membership) rather than the project not existing.
Corrected docs/SECRETS_AND_INFISICAL.md and docs/PHASE10_CANONICAL_STATE_AUDIT.md accordingly,
with the exact one-step fix (grant the identity access via Project Settings -> Access) and the
identity id needed to do it. No duplicate project was created.

Website pricing: a read-only fetch of rootnodeacademy.com found stale founding-price RANGES that
don't match the exact fixed V1 prices Chase gave directly this phase; Chase confirmed the fixed
prices in this repo's docs are correct and current. Noted as a real discrepancy for his own
awareness, not something this repo's scope covers fixing.

Updated the Phase 10 launch matrix with a Category column (TECHNICAL READY / OWNER DECISION
REQUIRED / EXTERNAL BLOCKER / HARDWARE BLOCKER) distinguishing who needs to act on each
remaining gate. No application code changed — audit/documentation reconciliation only.
2026-08-28 13:09:05 -05:00

160 lines
12 KiB
Markdown

# Phase 10 — Launch Readiness
Gates 2, 10-14, 19-20, and the final launch matrix. See `docs/PHASE10_CANONICAL_STATE_AUDIT.md`
(Gate 1), `docs/SECRETS_AND_INFISICAL.md` (Gate 3), `docs/PHASE10_PRODUCTION_DEPLOYMENT.md`
(Gates 4-9/15-16), and `docs/PHASE10_SECURITY_AUDIT.md` (Gate 18) for the rest.
## Gate 2 — Full application audit
Reviewed for architectural coherence across every phase; nothing was found inconsistent or in
need of a fix. Identity/auth, learning, Lab platform, business (offerings/registrations/
guardians/agreements), and commerce (pricing/payments/webhooks) all remain exactly as documented
in their own phase docs — re-verified by actually rerunning every suite (Gate 19 below), not by
re-reading code and assuming it still works.
## Gate 10 — Website integration
`docs/WEBSITE_REGISTRATION_AND_CHECKOUT.md` and `docs/WEBSITE_ENROLLMENT_INTEGRATION.md` remain
the full, accurate, already-tested contract: public offerings API, registration submission,
agreement acceptance, checkout creation, and the status-lookup endpoint. Nothing new was built —
the contract was fully proven end to end (including against real Stripe) in Phase 9/9.1. The
website itself (`rootnodeacademy.com`) is confirmed live and real (Gate 6, `docs/
PHASE10_PRODUCTION_DEPLOYMENT.md`) but remains a separate, not-RootNode-owned repository — this
phase did not access or modify it, per the standing boundary.
## Gate 11 — Winter Break offering
Pricing is locked and real: **$399.00 launch ("Founding Cohort") / $449.00 standard reference,
39900/44900 cents, paid in full, no deposit, no payment plan** — given directly by Chase,
validated against real Stripe TEST mode at the exact $399 amount in Phase 9.1. **Dates, venue,
and capacity remain undecided** — not invented by this phase, exactly as every prior phase's own
documentation already states. The offering therefore cannot be transitioned to
`enrollment_open` for real, public registration yet — the platform mechanism is ready
(`PATCH /api/admin/offerings/:id` accepts all four fields the moment they're decided).
## Gate 12 — Agreements / legal
`agreement_definitions`/`agreement_acceptances` architecture is real, tested, and versioned
(Phase 7-9). **No attorney-approved legal text exists for any required Winter Break agreement**
— `agreement_definitions.body_summary` remains a plain-language placeholder, exactly as every
prior phase's docs have stated since Phase 7. This phase did not write legal language and did
not treat any placeholder as attorney-approved, per Phase 10's own explicit instruction.
**LAUNCH BLOCKED — APPROVED AGREEMENT TEXT REQUIRED.** Likely required categories (not
authored, just the taxonomy Phase 10 asked to identify): program participation terms, guardian
consent (minor registrants), a participation/liability waiver, acceptable-use / lab/technology
rules, a cancellation/refund acknowledgment tied to whatever policy Gate 14 resolves, and a
privacy/data-handling notice if RootNode's counsel determines one is needed beyond what's already
in `docs/STUDENT_GUARDIAN_DATA_MODEL.md`. A media release is optional — RootNode's own choice,
not decided here.
## Gate 13 — Tax
**TAX DECISION REQUIRED.** No deliberate Mississippi (or any jurisdiction's) tax treatment has
been configured anywhere in this codebase — `payment_transactions.amount` is charged exactly as
the offering's own price, with no tax line item, no tax calculation, and no tax remittance logic
anywhere (Phase 9's own explicit "no complex tax automation" scope boundary, unchanged). This is
not this phase's decision to make, and the current absence of tax handling should not be read as
an implicit "no tax owed" determination — that requires Chase (or a professional) to actually
decide, then tell the platform what to do (charge tax as a line item, treat the $399 as
tax-inclusive, or confirm no sales tax applies to this specific service in this jurisdiction).
## Gate 14 — Refund / cancellation policy
**LAUNCH BLOCKED — REFUND/CANCELLATION POLICY REQUIRED.** The platform's MECHANICAL behavior is
real, tested, and proven against actual Stripe money-movement in Phase 9.1: a refund is recorded
as its own tracked state and **never automatically** cancels the registration or revokes academic
enrollment — confirmed directly against the database after a real Stripe TEST refund. What is
still missing is the actual customer-facing POLICY text (how many days before the camp is a
refund allowed, is it full or partial, etc.) — a founder decision this phase does not invent.
## Gate 19 — Complete regression
Fresh stack, this phase, after confirming canonical baseline (Gate 1):
| Suite | Result |
|---|---|
| `e2e-phase5b.js` | 32/32 |
| `e2e-phase5c.js` | 29/29 |
| `e2e-phase6f.js` | 17/17 |
| `e2e-phase7.js` | 17/17 |
| `e2e-phase8.js` | 16/16 |
| `e2e-phase9.js` | 20/20 |
| Course-content validator | PASS, 0 errors |
| Migration idempotency | Confirmed both ways — a full `down -v`/`up` cycle applies all 37 migrations cleanly from empty, and a same-database container restart re-applies with zero errors |
| Frontend production build | Clean (only the pre-existing chunk-size advisory) |
| `tofu validate` (Terraform/OpenTofu) | Clean |
| `ansible-playbook --syntax-check` | Clean |
**131 automated checks, 0 failures.** No code changed this phase (Phase 10 is audit/launch-prep,
not feature work), so this is confirmation, not new coverage.
`platform/test/stripe-integration-test.js` (the Phase 9.1 opt-in real-Stripe check) was **not**
rerun this phase — it requires real Stripe TEST credentials, which currently have no durable home
(Gate 3's Infisical project doesn't exist yet) and were correctly unset from the local `.env`
after Phase 9.1 ended. Phase 9.1's own evidence (`docs/PHASE9_1_STRIPE_TEST_VALIDATION.md`)
stands as the real-Stripe proof; nothing in this phase's own code changes touches that path.
## Gate 20 — Pre-launch dress rehearsal
`infra/scripts/drills/test-phase9-winter-camp-commerce.js` rerun fresh this phase against
current `main`: **13/13** — website registration → guardian → agreement → checkout → webhook →
enrollment → activation → classroom → a real disposable Lab task → instructor visibility, plus
failed-payment/duplicate-webhook/abandoned-checkout/last-seat-race, all using the deterministic
test provider (no real money, as instructed). This is the closest possible complete rehearsal
without real production infrastructure or real dates/venue/capacity — it cannot be run against
the ACTUAL Winter Break offering because that offering cannot legitimately open registration yet
(Gate 11). No fake evidence was created for the steps genuinely blocked by unresolved business
decisions.
## Final launch matrix
Phase 10.1 adds a **Category** column distinguishing four kinds of non-complete gate, since
they need entirely different people to resolve them: **TECHNICAL READY** (code/infra is done,
nothing left to build), **OWNER DECISION REQUIRED** (Chase has to decide something, no code
involved), **EXTERNAL BLOCKER** (a third party — Stripe, an attorney, a landlord — has to act or
verify something), **HARDWARE BLOCKER** (specifically the missing production server, since it
gates so many other rows).
| Gate | Status | Category | Evidence | Owner action | Blocks registration? |
|---|---|---|---|---|---|
| 1. Canonical repo reconciled | ✅ COMPLETE | — | `docs/PHASE10_CANONICAL_STATE_AUDIT.md` | None | No |
| 2. Second-PC state reconciled | ⚠️ Pending verification | OWNER DECISION REQUIRED | Gitea shows no stranded work; PC #2 itself unverified from here; the real Phase 9.5 pricing doc is confirmed to live there, unpushed | Run §1.3's commands on PC #2, then push the real Phase 9.5 document | No (informational) |
| 3. Secrets centralized (Infisical) | 🔧 One access grant away | OWNER DECISION REQUIRED | `docs/SECRETS_AND_INFISICAL.md` — project exists per Chase, this identity lacks access to it | Grant `claude-code-migration` access to the existing RootNode Academy project | No (dev secrets already safe locally) |
| 4. Production server | ⛔ BLOCKED | HARDWARE BLOCKER | `docs/PHASE10_PRODUCTION_DEPLOYMENT.md` | Purchase/provision hardware | **Yes** |
| 5. Proxmox / VMs | ⛔ BLOCKED | HARDWARE BLOCKER | Same — no host to provision on | Same | **Yes** |
| 6. Firewall/isolation | ✅ COMPLETE (code) | TECHNICAL READY | `docs/PHASE10_SECURITY_AUDIT.md` | None until real host exists | No (code ready) |
| 7. Production database | ⛔ BLOCKED | HARDWARE BLOCKER | Same hardware blocker | Same | **Yes** |
| 8. DNS | ✅ PARTIAL | HARDWARE BLOCKER (API portion) | `rootnodeacademy.com` live; no Platform API subdomain yet | Decide/create the API subdomain once a server exists | **Yes**, for the API portion |
| 9. HTTPS | ✅ PARTIAL | HARDWARE BLOCKER (API portion) | Website real HTTPS; Platform API HTTPS pending a real host | Same as above | **Yes**, for the API portion |
| 10. Monitoring | ✅ COMPLETE (code) | TECHNICAL READY | `/healthz`/`/metrics` live in every test run | None until deployed | No |
| 11. Backups | ✅ COMPLETE (code), ⛔ unexecuted | HARDWARE BLOCKER (execution) | Ansible `backup` role exists, never run | Run once a real host exists | **Yes** (restore-test) |
| 12. Restore test | ⛔ BLOCKED | HARDWARE BLOCKER | Never executed — no target | Same | **Yes** |
| 13. Stripe TEST validation | ✅ COMPLETE | — | `docs/PHASE9_1_STRIPE_TEST_VALIDATION.md` | None | No |
| 14. Stripe LIVE configuration | ⛔ BLOCKED | EXTERNAL BLOCKER | Not configured, not attempted | Chase completes Stripe business/identity verification, provides LIVE credentials | **Yes** |
| 15. Live webhook configuration | ⛔ BLOCKED | EXTERNAL + HARDWARE BLOCKER | Depends on #14 and a real HTTPS endpoint (#9) | Same | **Yes** |
| 16. Google Workspace | ✅ COMPLETE (validated in Phase 5C) | TECHNICAL READY | `docs/RUNBOOK_GOOGLE_WORKSPACE_EMAIL.md` | Deploy alongside the real server | No (already proven) |
| 17. Website integration | ✅ COMPLETE | — | Contract tested end to end, including real Stripe | None | No |
| 18. Winter Break price | ✅ COMPLETE | — | $399/$449, real, Stripe-validated, confirmed current with Chase (the live website's own pricing is stale — see `docs/PHASE10_CANONICAL_STATE_AUDIT.md`) | None (website update is separate, not-RootNode-owned repo work) | No |
| 19. Winter Break dates | ⚠️ DECISION REQUIRED | OWNER DECISION REQUIRED | Not decided | Chase decides | **Yes** |
| 20. Venue | ⚠️ DECISION REQUIRED | OWNER DECISION REQUIRED | Not decided | Chase decides | **Yes** |
| 21. Capacity | ⚠️ DECISION REQUIRED | OWNER DECISION REQUIRED | Not decided | Chase decides | **Yes** |
| 22. Agreements (legal text) | ⛔ BLOCKED | EXTERNAL BLOCKER | Placeholder only | Attorney-approved text required | **Yes** |
| 23. Refund/cancellation policy | ⚠️ DECISION REQUIRED | OWNER DECISION REQUIRED | Mechanism proven, policy undecided | Chase decides | **Yes** |
| 24. Tax decision | ⚠️ DECISION REQUIRED | OWNER DECISION REQUIRED / EXTERNAL | Not configured | Chase/professional decides | **Yes** |
| 25. Production offering | ⛔ BLOCKED | OWNER DECISION REQUIRED (compound) | Cannot legitimately open — depends on #19-24 | Depends on all of the above | **Yes** |
| 26. Instructor assignment | 🔧 MANUAL OWNER ACTION | OWNER DECISION REQUIRED | Mechanism ready (`instructor_offerings`) | Chase assigns once the real offering exists | **Yes** |
| 27. Roster process | ✅ COMPLETE (mechanism) | TECHNICAL READY | Rehearsed in Gate 20 | None | No |
| 28. Student activation | ✅ COMPLETE | TECHNICAL READY | Proven real, twice (Phase 9.1 + Gate 20) | None | No |
| 29. Lab capacity | ✅ COMPLETE (code) | HARDWARE BLOCKER (real sizing) | Capacity/race logic proven; real server capacity planning needs #4 | Plan once real hardware specs are known | No (mechanism), **yes** (real capacity) |
| 30. Complete dress rehearsal | ✅ COMPLETE (deterministic) | TECHNICAL READY | Gate 20, 13/13 | Repeat against the real offering once it can legitimately open | No |
## Bottom line
## PHASE 10 PARTIAL / WINTER BREAK LAUNCH BLOCKED
Every gate that is genuinely software/audit work is complete and verified. Every gate that is a
real business, legal, tax, or hardware decision remains exactly that — a decision, not
something this phase invented on Chase's behalf. See `docs/WINTER_BREAK_LAUNCH_CHECKLIST.md` for
the single consolidated, categorized checklist Chase can work down.