New: PHASE6F_ROOT_V1_PILOT_READINESS.md (phase summary), ROOT_V1_CURRICULUM_MANIFEST.md (canonical V1 scope), ROOT_V1_PREREQUISITE_MAP.md, ROOT_V1_ASSESSMENT_MAP.md, ROOT_V1_SYLLABUS.md, ROOT_V1_INSTRUCTOR_GUIDE.md, ROOT_V1_STUDENT_REQUIREMENTS.md, ROOT_V1_INSTRUCTOR_LED_PILOT.md, WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md. Updated: ROOT_PROGRAM_ARCHITECTURE.md (course-sequence table reflects real V1 statuses), ROOT_PILOT_CURRICULUM.md (self-paced-readiness correction), ROOT_PROGRAM_DURATION_MODEL.md (real post-integration totals: 64.2 V1 hours / 68.3 program-wide), ROOT_CAPSTONE_READINESS.md (§1b, the new root-09 course-layer gate), platform/README.md (test list). Co-Authored-By: Claude Sonnet 5 <[email protected]>
60 lines
3.3 KiB
Markdown
60 lines
3.3 KiB
Markdown
# ROOT_ Program Duration Model
|
|
|
|
Phase 6F Step 25 (built on Phase 6E §28) — recalculated from actual authored activities in the
|
|
live database after Phase 6F's curriculum integration (orientation module + the three
|
|
practice-bank intro lessons). Run: `SELECT c.course_id, SUM(a.estimated_duration_minutes) ...
|
|
GROUP BY c.course_id` against the current schema, same method as every prior version of this
|
|
document.
|
|
|
|
## Per-course totals (self-paced estimate)
|
|
|
|
| Course | Activities | Minutes | Hours | In ROOT_ V1? |
|
|
|---|---|---|---|---|
|
|
| ROOT 01 Computing & Linux Foundations | 38 | 353 | 5.9 | Yes |
|
|
| ROOT 02 Linux Administration & Networking | 37 | 388 | 6.5 | Yes |
|
|
| ROOT 03 Git & Collaborative Development | 31 | 312 | 5.2 | Yes |
|
|
| ROOT 04 Containers & Docker | 43 | 444 | 7.4 | Yes |
|
|
| ROOT 05 Kubernetes Foundations | 28 | 403 | 6.7 | Yes |
|
|
| ROOT 06 Kubernetes Application Workloads | 23 | 299 | 5.0 | Yes |
|
|
| ROOT 07 Kubernetes Networking & Configuration | 28 | 356 | 5.9 | Yes |
|
|
| ROOT 08 Kubernetes Storage & Scheduling | 15 | 250 | 4.2 | **No — excluded** |
|
|
| ROOT 09 Kubernetes Security | 40 | 745 | 12.4 | Yes (required for Capstone) |
|
|
| ROOT 10 Kubernetes Troubleshooting & Observability | 21 | 280 | 4.7 | Yes |
|
|
| ROOT 11 DevOps & Platform Engineering (orientation only) | 3 | 35 | 0.6 | Yes (optional bonus) |
|
|
| ROOT 12 Real Ops | 6 | 115 | 1.9 | Yes (required for Capstone) |
|
|
| ROOT Capstone | 5 | 120 | 2.0 | Yes |
|
|
| **Total (all authored content, incl. excluded ROOT 08)** | **318** | **4,100** | **68.3** | |
|
|
| **ROOT_ V1 total (excludes ROOT 08)** | **303** | **3,850** | **64.2** | |
|
|
|
|
ROOT 01's activity/minute count grew by 3 activities / 15 minutes this phase (the new
|
|
`root-01-m00-welcome-to-root` orientation module). ROOT 06/07/10 each grew by 1 activity / 3-4
|
|
minutes (their new practice-bank intro lessons). See `docs/ROOT_V1_CURRICULUM_MANIFEST.md` for
|
|
why.
|
|
|
|
**ROOT Foundations (01-04) subtotal: 149 activities, 1,497 minutes, 25.0 hours.**
|
|
|
|
## Self-paced vs. instructor-led
|
|
|
|
Unchanged from Phase 6D/6E: the figures above are self-paced estimates (the sum of each
|
|
activity's own `estimated_duration_minutes`). Instructor-led classroom time is still not a
|
|
separate summable database field — every Instructor Notes section documents approximate live-
|
|
facilitation timing in prose. A future phase could add a distinct
|
|
`estimated_duration_minutes_instructor_led` column if precise classroom scheduling becomes a
|
|
real, measured need. See `docs/ROOT_V1_INSTRUCTOR_LED_PILOT.md` for the cohort packaging this
|
|
duration model supports.
|
|
|
|
## What this is NOT
|
|
|
|
Not a marketing duration, not a promise, not a certification-hours figure.
|
|
`estimated_duration_minutes` values were authored as honest guesses (see
|
|
`docs/COURSE_AUTHORING_STANDARD.md` §4) — this total will get more accurate as real completion-
|
|
time data accumulates from actual students, not before.
|
|
|
|
## Program completeness — ROOT_ V1 vs. the full authored program
|
|
|
|
ROOT_ V1 (`docs/ROOT_V1_CURRICULUM_MANIFEST.md`) is 64.2 of the program's 68.3 authored hours —
|
|
everything except ROOT 08, deliberately excluded as non-Capstone-gating and not yet authored to
|
|
V1 standard. ROOT 11's remaining six modules were never counted in either total (they don't
|
|
exist yet, unlike ROOT 08's PARTIAL-but-real content) — see `docs/ROOT_CURRICULUM_COVERAGE_
|
|
MATRIX.md` for the honest READY/PARTIAL/PLANNED breakdown across the entire program.
|