Files
rootnode-academy/docs/ROOT_CAPSTONE_READINESS.md
T
ced4568andClaude Sonnet 5 d066410451
Release to Docker Hub / Build & Push Docker Image (push) Canceled after 0s
Release to Docker Hub / Create GitHub Release (push) Canceled after 0s
docs(phase6f): document ROOT_ V1 pilot readiness
New: PHASE6F_ROOT_V1_PILOT_READINESS.md (phase summary), ROOT_V1_CURRICULUM_MANIFEST.md
(canonical V1 scope), ROOT_V1_PREREQUISITE_MAP.md, ROOT_V1_ASSESSMENT_MAP.md,
ROOT_V1_SYLLABUS.md, ROOT_V1_INSTRUCTOR_GUIDE.md, ROOT_V1_STUDENT_REQUIREMENTS.md,
ROOT_V1_INSTRUCTOR_LED_PILOT.md, WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md.

Updated: ROOT_PROGRAM_ARCHITECTURE.md (course-sequence table reflects real V1 statuses),
ROOT_PILOT_CURRICULUM.md (self-paced-readiness correction), ROOT_PROGRAM_DURATION_MODEL.md
(real post-integration totals: 64.2 V1 hours / 68.3 program-wide), ROOT_CAPSTONE_READINESS.md
(§1b, the new root-09 course-layer gate), platform/README.md (test list).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 18:33:46 -05:00

127 lines
8.3 KiB
Markdown

# ROOT Capstone Readiness
Phase 6B §9/§10 — the instructional runway that prepares a student for the existing
`rootnode-capstone` assessment, and the server-side fix that makes its unlock rule actually
enforced. This document does not redesign the capstone engine itself (`assessments.js`,
`013_assessments.sql`) — see `docs/PHASE3B_LEARNING_AND_ASSESSMENT.md` for that.
## 1. The Capstone Readiness module
`root-capstone-m02-capstone-readiness` (sequenced BEFORE the real capstone module,
`root-capstone-m01-operate-and-recover`, within the `root-capstone` course) — 4 activities:
1. **Lesson — What the Capstone Measures & How the Draw Works.** Explains the required-vs-random
scenario draw, what "unlocked" means, and what completion records. Never publishes the exact
scenario IDs in the current pool or any answer.
2. **Lesson — Time Management & Troubleshooting Strategy Under a Clock.** Budgeting the 90
minutes, reusing the ROOT 10/ROOT 12 frameworks under pressure, and when to move on from a
stuck scenario.
3. **Knowledge check — Readiness Check: Are You Actually Ready?** A genuine self-assessment
(not a graded quiz) against concrete criteria, pointing back to specific ROOT_ modules for
any "no" answer.
4. **Reflection — What Completion Means.** Connects passing the Capstone to a durable,
demonstrated skill rather than a completion checkbox.
This module derives its own completion the same way every other lesson-only module does
(`activity_completions`, `manual_marker`) — it is intentionally NOT a prerequisite the real
capstone assessment engine checks before allowing a start (see §3 below for why these two gates
are deliberately independent).
## 1b. A third, independent gate added in Phase 6F
Phase 6F added `root-09-kubernetes-security` to `root-capstone`'s own `courses.prerequisites`
array (alongside the pre-existing `root-12-real-ops`) — a course-content-model-level gate,
distinct from both this readiness module (still non-gating) and the curriculum-path
`unlock_rule` in §3 below (still unchanged: six K8s scenario stages, no security stage). This
means the `root-capstone` COURSE itself (visible in the student/instructor course tree) is now
locked until ROOT 09 is also complete, even though the underlying `/api/assessments/rootnode-
capstone/start` route's own gate did not change. See `docs/ROOT_V1_CURRICULUM_MANIFEST.md`
Step 7 for the full evidence and reasoning, and `031_phase6f_capstone_security_prerequisite.sql`
for the migration. This adds a third independent layer rather than blurring the existing two —
consistent with this document's own §3 reasoning for keeping enforcement layers separate.
## 2. What was NOT built
No answers, no exact scenario IDs from the current pool, no capstone-specific hint content
beyond what the Lab's own progressive hints already provide. No new assessment engine, no
second capstone, no readiness "score." This is orientation content, not a shadow exam.
## 3. Why readiness-module completion and the real unlock gate are independent
The real capstone start (`POST /api/assessments/rootnode-capstone/start`) is gated by the
curriculum path's own `unlock_rule` — all 6 content stages of `rootnode-path.json` complete
(Foundation, Workloads, Networking, Configuration, Troubleshooting, Real Ops) — computed by
`computeCurriculumState()` (`curriculum-rules.js`), the exact same function `GET /api/capstone`
already used to display lock state. Whether a student has viewed or completed the Capstone
Readiness module has NO bearing on this gate.
This is deliberate, not an oversight: hard-locking the real assessment behind a CONTENT-MODEL
module (course_modules/module_activities) would mean the security-critical enforcement boundary
lives in two different systems that could drift out of sync — the curriculum-path unlock_rule
(Postgres-backed, achievement-derived, already proven) and the course-content prerequisite chain
(newer, additive, built for teaching sequencing rather than security enforcement). Keeping them
independent means: the readiness module is free to be completed early, late, or skipped by a
student who's already prepared some other way, while the real gate remains exactly as strict as
`docs/PHASE3B_LEARNING_AND_ASSESSMENT.md` originally specified.
## 4. The server-side unlock enforcement fix (Phase 6B §10)
**The gap** (documented in `docs/PHASE6A_ROOT_COURSE_FOUNDATION.md` §10): `POST /api/assessments/
:definitionId/start` (`learning-routes.js`) checked only that the assessment definition existed
and was `status = 'active'` — it never checked `unlock_rule` at all. `GET /api/capstone`
correctly computed and displayed lock state, and the student UI never exposed a "start" action
while locked, but a direct POST to the start route bypassed the check entirely. Student UI state
was the only thing standing between a student and an early capstone attempt.
**The fix**: the start route now resolves whether the requested definition is the curriculum
path's OWN configured capstone (`path.stages.find(s => s.type === 'capstone' && s
.capstone_assessment_id === definition.assessment_definition_id)`), and if so, computes the
exact same `computeCurriculumState()` gate `/api/capstone` already relies on. A `locked` gate
now returns a clean `403 { error: 'locked', message, blocking_stage_ids }` — the same
`blocking_stage_ids` shape `/api/capstone` already exposes, so a client integrating against this
route gets consistent, already-documented error shape rather than a new one. No internal state
beyond the stage ids that are actually incomplete is ever returned.
**What is NOT gated**: any assessment definition the curriculum path does NOT name as its
capstone (e.g. `rootnode-quick-assessment`) is completely unaffected — the check only ever
triggers for the one definition the path itself points at via `capstone_assessment_id`.
**What remains valid**: no existing `assessment_sessions` row, no achievement, no enrollment
completion record was touched by this fix — it only affects a NEW start attempt going forward.
A student who already legitimately completed the capstone before this fix keeps that record
exactly as it was.
**Regression coverage**: `platform/test/e2e-phase6b.js` proves both directions — a direct start
attempt before prerequisites are met is rejected (`403 locked`), and a legitimately unlocked
attempt (all 6 stages genuinely complete) still succeeds and completes normally. A pre-existing
gap was also found and fixed in `e2e-phase5b.js`'s own capstone-completion test, which had never
included the `real-ops` stage in its completion loop — it was passing only because the very
bug this phase fixes let an incomplete curriculum still start the capstone. See that test file's
own comment for detail.
## 5. Phase 6C re-review against the expanded curriculum
Re-checked every item this doc depends on against Phase 6C's changes and found no gap requiring
a fix:
- **The unlock gate's 6 stages are unchanged**: Foundation, Workloads, Networking,
Configuration, Troubleshooting, Real Ops (`rootnode-path.json`). Phase 6C added and upgraded
modules within those stages' courses (ROOT 05-07, 10) plus ROOT 09 (Security) and the new
ROOT 11 orientation — **ROOT 08 (Storage & Scheduling) and ROOT 09 (Security) do not appear
among the 6 gating stages and still do not gate the capstone.** This is documented
architecture, not an oversight — confirmed by direct test
(`platform/test/e2e-phase6c.js`, "the capstone unlock gate is unaffected by ROOT 09 (security)
being incomplete") rather than assumed.
- **`root-capstone-m01-operate-and-recover`** was promoted from `partial` to `ready` this phase
as a documented exception (no activity added — its single `capstone` activity IS the exam;
see `docs/PHASE6C_CURRICULUM_COMPLETION.md`). This changes only its content-model status
label, not the real unlock gate described in §3-4 above, which remains entirely independent.
- **Random draw pools, timing, hint policy, and completion rule** for `rootnode-capstone` itself
were not touched by Phase 6C — no scenario content this phase added or changed feeds that
pool.
- **The Capstone Readiness module (§1)** required no changes — its 4 activities and their
relationship to the (still unchanged) real unlock gate remain accurate as described above.
No redesign was made or needed; Phase 6C's curriculum expansion did not require reopening the
capstone engine.