Commit Graph
1 Commits
Author SHA1 Message Date
ced4568andClaude Sonnet 5 bd0a10fbfb docs(phase6c): pilot readiness standard, pilot curriculum manifest, ROOT 11 scope
Adds the four required Phase 6C documents:

- ROOT_PILOT_READINESS_STANDARD.md — the explicit 8-point sufficiency bar
  used to judge every module this phase, replacing any fixed activity-count
  assumption.
- ROOT11_DEVOPS_PLATFORM_SCOPE.md — evaluates all 7 proposed ROOT 11 modules
  individually (READY TO AUTHOR NOW / PARTIAL-LESSON-ONLY / REQUIRES FUTURE
  LAB ENVIRONMENT), with what current infra supports vs. what GitOps/CI-CD/
  IaC/observability would each require.
- ROOT_PILOT_CURRICULUM.md — the authoritative pilot manifest: instructor-led
  as the first pilot's delivery mode, honest READY/PARTIAL/DEFERRED/NOT IN
  PILOT status per course and module, and what is intentionally excluded
  (ROOT 01-04 never authored, ROOT 08 non-capstone-gating and deferred, ROOT
  11 modules 2-7, three practice-bank modules instructor-led-only this pilot).
- PHASE6C_CURRICULUM_COMPLETION.md — the phase's own record of what was
  upgraded, why, the bug found and fixed, and the pilot readiness conclusion.

Updates ROOT_CURRICULUM_COVERAGE_MATRIX.md with the verified before/after
module counts (21->22 modules, 6->16 READY) and per-module upgrade rationale,
and ROOT_CAPSTONE_READINESS.md with a re-review confirming the unlock gate's
6 stages, and ROOT 08/09's non-gating status, are unchanged by this phase's
curriculum expansion.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 11:21:09 -05:00