Commit Graph
4 Commits
Author SHA1 Message Date
ced4568andClaude Sonnet 5 d066410451 docs(phase6f): document ROOT_ V1 pilot readiness
Release to Docker Hub / Build & Push Docker Image (push) Canceled after 0s
Release to Docker Hub / Create GitHub Release (push) Canceled after 0s
New: PHASE6F_ROOT_V1_PILOT_READINESS.md (phase summary), ROOT_V1_CURRICULUM_MANIFEST.md
(canonical V1 scope), ROOT_V1_PREREQUISITE_MAP.md, ROOT_V1_ASSESSMENT_MAP.md,
ROOT_V1_SYLLABUS.md, ROOT_V1_INSTRUCTOR_GUIDE.md, ROOT_V1_STUDENT_REQUIREMENTS.md,
ROOT_V1_INSTRUCTOR_LED_PILOT.md, WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md.

Updated: ROOT_PROGRAM_ARCHITECTURE.md (course-sequence table reflects real V1 statuses),
ROOT_PILOT_CURRICULUM.md (self-paced-readiness correction), ROOT_PROGRAM_DURATION_MODEL.md
(real post-integration totals: 64.2 V1 hours / 68.3 program-wide), ROOT_CAPSTONE_READINESS.md
(§1b, the new root-09 course-layer gate), platform/README.md (test list).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 18:33:46 -05:00
ced4568andClaude Sonnet 5 87ad1251ce docs(phase6e): document the ROOT Foundations Completion milestone
Adds PHASE6E_ROOT_FOUNDATIONS_COMPLETION.md (the phase's own record: what was authored, the
dash-vs-bash scenario bug found and fixed, the pre-existing lock-enforcement gap found and
fixed, the regression fallout that fix revealed in earlier suites and why each was a stale test
assumption rather than a platform bug, and honest test/rehearsal/regression results).

Updates ROOT_FOUNDATIONS_PILOT_READINESS.md (full re-audit: all 4 ROOT Foundations courses now
READY, not inherited blindly from Phase 6D), ROOT_PROGRAM_DURATION_MODEL.md (real ROOT 02-04
duration data: 24.7 combined hours, landing inside Phase 6D's own estimated range; 67.9 hours
across the full authored program), ROOT_PILOT_CURRICULUM.md (ROOT 02-04 move from NOT IN PILOT
to IN PILOT with full module-level detail; the pilot is now genuinely self-paced-capable for the
entire foundational half, not just instructor-led), ROOT_PROGRAM_ARCHITECTURE.md and
ROOT_CURRICULUM_COVERAGE_MATRIX.md (course/module/scenario totals), and
ROOT_FOUNDATIONS_ARCHITECTURE.md (marked as-built, not just as-designed).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 17:09:02 -05:00
ced4568andClaude Sonnet 5 b6516a74db docs(phase6d): document the ROOT Foundations milestone
Adds PHASE6D_ROOT_FOUNDATIONS.md (the phase's own record: the generic-scenario-engine finding,
the tested container-runtime decision, what was authored, the bugs found and fixed, and honest
test/regression/rehearsal results) and ROOT_FOUNDATIONS_PILOT_READINESS.md (module-by-module
READY/DEFERRED classification for ROOT 01-04 against the unchanged Phase 6C readiness standard —
ROOT 01 READY, ROOT 02-04 DEFERRED by design).

Adds ROOT_PROGRAM_DURATION_MODEL.md — real per-course instructional-hour totals computed from
actual estimated_duration_minutes values (2,931 minutes / 48.9 hours across all authored
content), not invented, with an explicit note on why instructor-led timing isn't a separate
summable field yet.

Updates ROOT_PROGRAM_ARCHITECTURE.md (ROOT 01's new READY status and the real 01-04 prerequisite
chain), ROOT_PILOT_CURRICULUM.md (ROOT 01 added to the pilot, module-level detail), and
ROOT_CURRICULUM_COVERAGE_MATRIX.md (updated module/scenario totals) to reflect what Phase 6D
actually built, without restating Phase 6C's own Kubernetes-scenario tables.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 13:00:41 -05:00
ced4568andClaude Sonnet 5 bd0a10fbfb docs(phase6c): pilot readiness standard, pilot curriculum manifest, ROOT 11 scope
Adds the four required Phase 6C documents:

- ROOT_PILOT_READINESS_STANDARD.md — the explicit 8-point sufficiency bar
  used to judge every module this phase, replacing any fixed activity-count
  assumption.
- ROOT11_DEVOPS_PLATFORM_SCOPE.md — evaluates all 7 proposed ROOT 11 modules
  individually (READY TO AUTHOR NOW / PARTIAL-LESSON-ONLY / REQUIRES FUTURE
  LAB ENVIRONMENT), with what current infra supports vs. what GitOps/CI-CD/
  IaC/observability would each require.
- ROOT_PILOT_CURRICULUM.md — the authoritative pilot manifest: instructor-led
  as the first pilot's delivery mode, honest READY/PARTIAL/DEFERRED/NOT IN
  PILOT status per course and module, and what is intentionally excluded
  (ROOT 01-04 never authored, ROOT 08 non-capstone-gating and deferred, ROOT
  11 modules 2-7, three practice-bank modules instructor-led-only this pilot).
- PHASE6C_CURRICULUM_COMPLETION.md — the phase's own record of what was
  upgraded, why, the bug found and fixed, and the pilot readiness conclusion.

Updates ROOT_CURRICULUM_COVERAGE_MATRIX.md with the verified before/after
module counts (21->22 modules, 6->16 READY) and per-module upgrade rationale,
and ROOT_CAPSTONE_READINESS.md with a re-review confirming the unlock gate's
6 stages, and ROOT 08/09's non-gating status, are unchanged by this phase's
curriculum expansion.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 11:21:09 -05:00