Commit Graph
2 Commits
Author SHA1 Message Date
ced4568 7baf7074e5 fix(email): support a delegated-mailbox alias distinct from the delegated Workspace account
Real-world case found during setup: the sending address ([email protected]) is an
alias of an existing Workspace user, not its own paid seat (a deliberate cost-saving choice).
Domain-wide delegation authorizes a real Workspace ACCOUNT, not an arbitrary alias string, so
using the alias directly as the delegated 'sub' claim would have been wrong. Added
GOOGLE_DELEGATED_USER (the account that actually owns the alias and was granted delegation) as
an optional override, falling back to EMAIL_FROM_ADDRESS unchanged when the sending address is
itself a primary account. EMAIL_FROM_ADDRESS remains the visible From: header in both cases.
Documented in docs/RUNBOOK_GOOGLE_WORKSPACE_EMAIL.md with a concrete example.
2026-08-25 17:38:59 -05:00
ced4568 777efd168d docs(phase5c): enrollment communications documentation + Google Workspace runbook
- PHASE5C_ENROLLMENT_COMMUNICATIONS.md: the full design doc.
- RUNBOOK_GOOGLE_WORKSPACE_EMAIL.md: every REQUIRES GOOGLE WORKSPACE ADMIN ACTION step
  (mailbox, service account, domain-wide delegation scoped to gmail.send only, SPF/DKIM/DMARC),
  environment variables, testing procedure, production secret handling, rotation, revocation,
  troubleshooting, quotas.
- RUNBOOK_STUDENT_ACTIVATION.md: day-to-day operation of the pipeline from /admin.
- WEBSITE_ENROLLMENT_INTEGRATION.md: explicit website-vs-RootNode responsibility boundary,
  the new contact_email field, and closes the 'RootNode doesn't send activation email yet'
  known limitation this doc previously documented.
- RUNBOOK_SELF_PACED_ENROLLMENT.md, RUNBOOK_STUDENT_ACCOUNT_LIFECYCLE.md: point at the new
  automatic-email behavior and the Resend activation control.
- REMOTE_AND_SELF_PACED_ARCHITECTURE.md, ENGINEERING_SOP.md: close the enrollment-
  communication gap; new ENGINEERING_SOP §16.
- PRODUCTION_VALIDATION_CHECKLIST.md, README.md, platform/README.md: cross-references and a
  Phase 5C production-validation section.
2026-08-25 14:45:18 -05:00