- infra/scripts/simulate-two-host/: real two-Docker-network simulation
(Gateway genuinely isolated from any Lab bridge network) proving the
Lab Host Router fix - 13/13 real assertions (HTTP+WebSocket through the
Router, Alice/Bob isolation, garbage/destroyed tokens, mTLS-only Router
access).
- infra/scripts/drills/: Lab Host loss/rebuild (9/9), deployment rollback,
CI-fails-closed (6 required failure modes), fake cohort dress rehearsal
(14/14, one continuous narrative through the real app).
- infra/ci/gitea-workflows/build-and-test.yml: new security-scan job
(npm audit, gitleaks, hadolint, shellcheck, trivy - all free/open-source),
severity policy in docs/SECURITY_SCANNING.md (CRITICAL/HIGH blocks,
MEDIUM/LOW reported only). Gates build-images alongside regression.
Found and fixed two real pre-existing bugs via the CI-fails-closed drill:
staging-smoke-test.sh and production-smoke-test.sh both had a classic
set -e gotcha (curl ... && echo "OK" as one statement - a failing command
that isn't last in an && chain doesn't trigger -e) that let an
unreachable/broken endpoint fall through silently instead of failing the
smoke test.
platform/test/e2e-phase3a.js updated for the new paginated
/api/admin/audit-events response shape (Phase 4.1 pagination work).
boot-labs.js drives the real admin Prepare-Labs endpoint (reusing the
existing session-helper.js from Phase 3A) and records boot time/failure
rate; sample-resources.sh samples real docker stats for running Labs.
capacity-model.js turns measured per-Lab CPU/memory into a recommended/
warning/hard-admission-control concurrency threshold - no concurrency
number is hardcoded as a marketing figure, every input is explicitly
placeholder data until measured against the real host.
Plus deploy/rollback/smoke-test scripts used by the CI/CD and deployment
runbooks. All syntax-checked; validate-compose.sh and capacity-model.js
actually run against real inputs.