Commit Graph
5 Commits
Author SHA1 Message Date
ced4568 74033b4cb8 docs(audit): reconcile Phase 10 findings on Phase 9.5, Infisical, and website pricing
Phase 9.5: reconfirmed no canonical commit exists (broader content search across full history —
still zero hits outside this session's own commits); Chase confirmed the real document lives on
PC #2, unpushed. Not duplicated here per Chase's explicit instruction — he owns bringing it to
canonical Gitea.

Infisical: Phase 10's 'project does not exist' finding was incomplete, not wrong about what it
checked — a proper org-scoped API enumeration (8 projects) still shows no RootNode Academy
project visible to the claude-code-migration machine identity, even though Chase confirms it
exists. Root cause narrowed to a missing per-project access grant (Infisical scopes identity
visibility per-project, separate from org membership) rather than the project not existing.
Corrected docs/SECRETS_AND_INFISICAL.md and docs/PHASE10_CANONICAL_STATE_AUDIT.md accordingly,
with the exact one-step fix (grant the identity access via Project Settings -> Access) and the
identity id needed to do it. No duplicate project was created.

Website pricing: a read-only fetch of rootnodeacademy.com found stale founding-price RANGES that
don't match the exact fixed V1 prices Chase gave directly this phase; Chase confirmed the fixed
prices in this repo's docs are correct and current. Noted as a real discrepancy for his own
awareness, not something this repo's scope covers fixing.

Updated the Phase 10 launch matrix with a Category column (TECHNICAL READY / OWNER DECISION
REQUIRED / EXTERNAL BLOCKER / HARDWARE BLOCKER) distinguishing who needs to act on each
remaining gate. No application code changed — audit/documentation reconciliation only.
2026-08-28 13:09:05 -05:00
ced4568 0b2303a3e2 docs(phase10): canonical state audit, secrets inventory, production/security/launch readiness
Gate 1 — canonical state audit: this workstation's HEAD/origin/main and every claimed milestone
SHA (Phase 2A through 9.1) verified consistent; no stranded branches/tags on Gitea; full-history
secret scan clean (no rotation required); Phase 9.5 confirmed absent from canonical history
(pricing was given directly by Chase and used without it); second-PC reconciliation commands
provided since this session cannot see that machine.

Gate 3 — secrets: real inventory derived from process.env greps across every service (not
guessed); Infisical auth fixed (wrong domain was the actual root cause of Phase 9.1's failures —
the identity belongs to infisical.cedshomelab.com, not app.infisical.com) but no RootNode
Academy project exists there yet, contradicting this phase's own authorization — flagged for
Chase to create.

Gates 4-9/15-16 — production: verified, not assumed, that no dedicated server/Proxmox VM has
been provisioned (empty terraform.tfvars, no state file, placeholder group_vars/production.yml)
— IaC validated (tofu validate, ansible --syntax-check both clean) and left unexecuted per this
phase's own 'do not fake production deployment' instruction. rootnodeacademy.com confirmed live
(Cloudflare, real HTTPS) — the separate, not-RootNode-owned website; no Platform API subdomain
exists yet.

Gate 18 — security audit: full review against every regression suite rerun this phase; no
launch-critical defect found.

Gates 19/20 — full regression (131 checks: e2e-phase5b/5c/6f/7/8/9, content validation,
migrations, frontend build) and the Winter Break commerce rehearsal, both rerun clean against
current main.

Gates 10-14/21 — website integration, Winter Break pricing (99/49, real, Stripe-validated),
agreements/legal, tax, and refund policy all reviewed; legal text/tax/refund policy/dates/venue/
capacity correctly left as open owner decisions, not invented.

No application code changed this phase — audit/launch-prep only.
2026-08-28 12:07:25 -05:00
ced4568 a4c0058f8c docs(stripe): document real Stripe TEST-mode validation results
PHASE9_1_STRIPE_TEST_VALIDATION.md rewritten from BLOCKED to the real, proven results: a real
Stripe TEST Checkout, a real TEST payment at the founder-approved $399 Founding Cohort price, a
genuine signed webhook, the existing registration->enrollment conversion, a real
duplicate-delivery proof, a real automated abandoned-checkout proof, a real refund with the
non-cascade rule reconfirmed, full Stripe<->RootNode reconciliation IDs, and the one real defect
found and fixed. STRIPE_INTEGRATION_RUNBOOK.md updated (real-Stripe local testing is no longer
'not yet exercised'; notes the no-sudo Stripe CLI install path and --api-key/--print-secret
usage). WINTER_BREAK_LAUNCH_CHECKLIST.md: Stripe TEST validation checked, price checked ($399
launch / $449 retail per Chase directly), live-mode items correctly still unchecked.
PHASE9_COMMERCE_AND_LAUNCH.md's Phase 9.1 addendum updated to reflect completion.
2026-08-28 09:47:11 -05:00
ced4568 77fd1869db docs(stripe): document Phase 9.1 blocked status and live-mode readiness checklist
New: PHASE9_1_STRIPE_TEST_VALIDATION.md — baseline verification, the exact Stripe-credential
search performed (none found), the Stripe architecture review (dynamic price_data, unchanged),
what was proven vs. blocked per the mission's own step list, and the live-mode readiness
checklist. Updated: STRIPE_INTEGRATION_RUNBOOK.md and WINTER_BREAK_LAUNCH_CHECKLIST.md to point
at the new opt-in test and the blocked status. PHASE9_COMMERCE_AND_LAUNCH.md gets a short
addendum. No application code changed this phase — no genuine defect was exposed without real
Stripe traffic, so no regression rerun was required.
2026-08-27 10:40:53 -05:00
ced4568 80a5f6e457 docs(phase9): document commerce integration and Winter Break launch readiness
New: PHASE9_COMMERCE_AND_LAUNCH.md, WEBSITE_REGISTRATION_AND_CHECKOUT.md,
STRIPE_INTEGRATION_RUNBOOK.md, WINTER_BREAK_LAUNCH_CHECKLIST.md. Updated:
ROOTNODE_ACADEMY_BUSINESS_AND_PRODUCT_ARCHITECTURE.md (commerce boundary + PHASE 9 BUILT rows),
OFFERING_AND_REGISTRATION_MODEL.md (pricing, the payment/commerce boundary, three-status
principle), WEBSITE_ENROLLMENT_INTEGRATION.md (price fields, real agreement/checkout/webhook
sections replacing Phase 8 placeholders), WINTER_BREAK_CAMP_OPERATIONS.md (real payment step
replacing the manual placeholder).
2026-08-27 09:06:04 -05:00