New: PHASE6F_ROOT_V1_PILOT_READINESS.md (phase summary), ROOT_V1_CURRICULUM_MANIFEST.md (canonical V1 scope), ROOT_V1_PREREQUISITE_MAP.md, ROOT_V1_ASSESSMENT_MAP.md, ROOT_V1_SYLLABUS.md, ROOT_V1_INSTRUCTOR_GUIDE.md, ROOT_V1_STUDENT_REQUIREMENTS.md, ROOT_V1_INSTRUCTOR_LED_PILOT.md, WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md. Updated: ROOT_PROGRAM_ARCHITECTURE.md (course-sequence table reflects real V1 statuses), ROOT_PILOT_CURRICULUM.md (self-paced-readiness correction), ROOT_PROGRAM_DURATION_MODEL.md (real post-integration totals: 64.2 V1 hours / 68.3 program-wide), ROOT_CAPSTONE_READINESS.md (§1b, the new root-09 course-layer gate), platform/README.md (test list). Co-Authored-By: Claude Sonnet 5 <[email protected]>