Course -> module -> objective -> lesson/demo/knowledge-check/guided-
exercise -> scenario(s) -> Real Ops connection -> status, for ROOT 05-10,
12, and Capstone, grounded in the Phase 6A inventory. Every scenario
placement has an intentional reason, not a coverage-percentage target —
includes an explicit 'duplicate concepts identified' section for the
near-duplicate scenario pairs (pod-security-context vs.
cks-pod-security-context, rbac-clusterrole vs. cks-rbac-clusterrole,
network-policy's architectural vs. security-control framing) and which
scenarios are deliberately left out of structured curriculum entirely.
Co-Authored-By: Claude Sonnet 5 <[email protected]>