3 Commits
Author SHA1 Message Date
ced4568andClaude Sonnet 5 d066410451 docs(phase6f): document ROOT_ V1 pilot readiness
Release to Docker Hub / Build & Push Docker Image (push) Canceled after 0s
Release to Docker Hub / Create GitHub Release (push) Canceled after 0s
New: PHASE6F_ROOT_V1_PILOT_READINESS.md (phase summary), ROOT_V1_CURRICULUM_MANIFEST.md
(canonical V1 scope), ROOT_V1_PREREQUISITE_MAP.md, ROOT_V1_ASSESSMENT_MAP.md,
ROOT_V1_SYLLABUS.md, ROOT_V1_INSTRUCTOR_GUIDE.md, ROOT_V1_STUDENT_REQUIREMENTS.md,
ROOT_V1_INSTRUCTOR_LED_PILOT.md, WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md.

Updated: ROOT_PROGRAM_ARCHITECTURE.md (course-sequence table reflects real V1 statuses),
ROOT_PILOT_CURRICULUM.md (self-paced-readiness correction), ROOT_PROGRAM_DURATION_MODEL.md
(real post-integration totals: 64.2 V1 hours / 68.3 program-wide), ROOT_CAPSTONE_READINESS.md
(§1b, the new root-09 course-layer gate), platform/README.md (test list).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 18:33:46 -05:00
ced4568andClaude Sonnet 5 bd0a10fbfb docs(phase6c): pilot readiness standard, pilot curriculum manifest, ROOT 11 scope
Adds the four required Phase 6C documents:

- ROOT_PILOT_READINESS_STANDARD.md — the explicit 8-point sufficiency bar
  used to judge every module this phase, replacing any fixed activity-count
  assumption.
- ROOT11_DEVOPS_PLATFORM_SCOPE.md — evaluates all 7 proposed ROOT 11 modules
  individually (READY TO AUTHOR NOW / PARTIAL-LESSON-ONLY / REQUIRES FUTURE
  LAB ENVIRONMENT), with what current infra supports vs. what GitOps/CI-CD/
  IaC/observability would each require.
- ROOT_PILOT_CURRICULUM.md — the authoritative pilot manifest: instructor-led
  as the first pilot's delivery mode, honest READY/PARTIAL/DEFERRED/NOT IN
  PILOT status per course and module, and what is intentionally excluded
  (ROOT 01-04 never authored, ROOT 08 non-capstone-gating and deferred, ROOT
  11 modules 2-7, three practice-bank modules instructor-led-only this pilot).
- PHASE6C_CURRICULUM_COMPLETION.md — the phase's own record of what was
  upgraded, why, the bug found and fixed, and the pilot readiness conclusion.

Updates ROOT_CURRICULUM_COVERAGE_MATRIX.md with the verified before/after
module counts (21->22 modules, 6->16 READY) and per-module upgrade rationale,
and ROOT_CAPSTONE_READINESS.md with a re-review confirming the unlock gate's
6 stages, and ROOT 08/09's non-gating status, are unchanged by this phase's
curriculum expansion.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 11:21:09 -05:00
ced4568andClaude Sonnet 5 2db136875f docs(phase6b): document curriculum expansion
PHASE6B_ROOT_CURRICULUM_EXPANSION.md — the phase summary: what was
authored per course, the is_required extension, the capstone unlock
fix, verified scenario coverage before/after (44 -> 88 of 98, 89.8%,
by direct query not estimate), and honest known limitations/Phase 6C
recommendations.

ROOT_CAPSTONE_READINESS.md — the readiness module and the server-side
unlock fix in full detail, including why the module's completion and
the real assessment's unlock gate are deliberately independent systems.

Updated ROOT_CURRICULUM_INVENTORY.md (Phase 6B coverage numbers),
ROOT_PROGRAM_ARCHITECTURE.md (ROOT 08/09 PARTIAL, new module lists per
course), COURSE_CONTENT_MODEL.md (is_required completion rule, a new
content-versioning section per this phase's own requirement),
COURSE_AUTHORING_STANDARD.md (classifying near-duplicate/advanced
scenarios), ENGINEERING_SOP.md (new Phase 6B section),
REMOTE_AND_SELF_PACED_ARCHITECTURE.md (cross-reference), and
platform/README.md (e2e-phase6b.js, the Phase 6B rehearsal, isolation-
per-suite regression guidance).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 09:09:47 -05:00