6 Commits
Author SHA1 Message Date
ced4568andClaude Sonnet 5 2db136875f docs(phase6b): document curriculum expansion
PHASE6B_ROOT_CURRICULUM_EXPANSION.md — the phase summary: what was
authored per course, the is_required extension, the capstone unlock
fix, verified scenario coverage before/after (44 -> 88 of 98, 89.8%,
by direct query not estimate), and honest known limitations/Phase 6C
recommendations.

ROOT_CAPSTONE_READINESS.md — the readiness module and the server-side
unlock fix in full detail, including why the module's completion and
the real assessment's unlock gate are deliberately independent systems.

Updated ROOT_CURRICULUM_INVENTORY.md (Phase 6B coverage numbers),
ROOT_PROGRAM_ARCHITECTURE.md (ROOT 08/09 PARTIAL, new module lists per
course), COURSE_CONTENT_MODEL.md (is_required completion rule, a new
content-versioning section per this phase's own requirement),
COURSE_AUTHORING_STANDARD.md (classifying near-duplicate/advanced
scenarios), ENGINEERING_SOP.md (new Phase 6B section),
REMOTE_AND_SELF_PACED_ARCHITECTURE.md (cross-reference), and
platform/README.md (e2e-phase6b.js, the Phase 6B rehearsal, isolation-
per-suite regression guidance).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-26 09:09:47 -05:00
ced4568andClaude Sonnet 5 fd38d06055 docs(phase6a): document RootNode course foundation
COURSE_AUTHORING_STANDARD.md — the standard every future lesson/module
must follow (target learner, prerequisites, measurable objectives,
concept-before-lab, instructor notes, terminology, versioning, review
requirements), grounded in the gold-standard module as the reference
implementation.

PHASE6A_ROOT_COURSE_FOUNDATION.md — the phase summary: youth-ladder
context, the Google Workspace status already recorded in Phase 5C's own
docs, architecture/build summary, honest content states, test results,
explicit non-goals, and known limitations/Phase 6B recommendations.

Updated ENGINEERING_SOP.md (new Phase 6A section + a curriculum-content
cross-reference), REMOTE_AND_SELF_PACED_ARCHITECTURE.md (a 7th
closed gap: self-paced enrollment now resolves to a real course tree,
not just a scenario list), LAB_ARCHITECTURE.md (Phase 6A reuses the
disposable Lab unmodified, verified by a real rehearsal), and
platform/README.md (course model in the api/ summary, new e2e suite
descriptions for 5A/5B/5C/6A which were missing entirely, and the
real-Lab rehearsal script).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
2026-08-25 23:30:11 -05:00
ced4568 777efd168d docs(phase5c): enrollment communications documentation + Google Workspace runbook
- PHASE5C_ENROLLMENT_COMMUNICATIONS.md: the full design doc.
- RUNBOOK_GOOGLE_WORKSPACE_EMAIL.md: every REQUIRES GOOGLE WORKSPACE ADMIN ACTION step
  (mailbox, service account, domain-wide delegation scoped to gmail.send only, SPF/DKIM/DMARC),
  environment variables, testing procedure, production secret handling, rotation, revocation,
  troubleshooting, quotas.
- RUNBOOK_STUDENT_ACTIVATION.md: day-to-day operation of the pipeline from /admin.
- WEBSITE_ENROLLMENT_INTEGRATION.md: explicit website-vs-RootNode responsibility boundary,
  the new contact_email field, and closes the 'RootNode doesn't send activation email yet'
  known limitation this doc previously documented.
- RUNBOOK_SELF_PACED_ENROLLMENT.md, RUNBOOK_STUDENT_ACCOUNT_LIFECYCLE.md: point at the new
  automatic-email behavior and the Resend activation control.
- REMOTE_AND_SELF_PACED_ARCHITECTURE.md, ENGINEERING_SOP.md: close the enrollment-
  communication gap; new ENGINEERING_SOP §16.
- PRODUCTION_VALIDATION_CHECKLIST.md, README.md, platform/README.md: cross-references and a
  Phase 5C production-validation section.
2026-08-25 14:45:18 -05:00
ced4568 1c08a30c7f docs(phase5b): self-paced enrollment documentation + website integration contract
- PHASE5B_SELF_PACED_ENROLLMENT.md: the full design doc.
- RUNBOOK_SELF_PACED_ENROLLMENT.md: operational runbook for /admin -> Programs.
- WEBSITE_ENROLLMENT_INTEGRATION.md: the complete contract for the separate website team —
  endpoint, auth, request/response schema, idempotency/retry rules, student matching, minor/
  no-email behavior, error responses, what not to send, local testing, production-secret
  handling. Written to be usable without reading the Platform API source.
- REMOTE_AND_SELF_PACED_ARCHITECTURE.md: closes the self-registration/curriculum-assignment/
  delivery-mode/enrollment-model gaps this doc previously flagged as Phase 5+ scope.
- ENGINEERING_SOP.md: new §15. LAB_ARCHITECTURE.md, PRODUCTION_VALIDATION_CHECKLIST.md,
  README.md, platform/README.md: cross-references and a Phase 5B production-validation section.
2026-08-25 12:10:13 -05:00
ced4568 896c230142 docs(phase5a): student identity and remote classroom documentation
Release to Docker Hub / Build & Push Docker Image (push) Canceled after 0s
Release to Docker Hub / Create GitHub Release (push) Canceled after 0s
- PHASE5A_STUDENT_IDENTITY_REMOTE_CLASSROOM.md: the full design doc.
- RUNBOOK_STUDENT_ACCOUNT_LIFECYCLE.md, RUNBOOK_REMOTE_CLASSROOM.md: operational runbooks.
- REMOTE_AND_SELF_PACED_ARCHITECTURE.md: closes the 'no real student authentication' gap this
  doc previously flagged as the one item blocking self-paced delivery.
- ENGINEERING_SOP.md §5 rewritten (was describing a pre-Phase-2A state no longer true of any
  deployed version of this codebase) plus a new §14; roadmap item 3 updated.
- LAB_ARCHITECTURE.md, PRODUCTION_VALIDATION_CHECKLIST.md, README.md, platform/README.md:
  cross-references and a Phase 5A production-validation section.
2026-08-25 01:20:13 -05:00
ced4568 5bc0743b08 docs(phase4.1): pre-production hardening documentation
Release to Docker Hub / Build & Push Docker Image (push) Canceled after 0s
Release to Docker Hub / Create GitHub Release (push) Canceled after 0s
Master overview (PHASE4_1_PREPRODUCTION_HARDENING.md) covering all 27
substantive items, plus REMOTE_AND_SELF_PACED_ARCHITECTURE.md (reviews
what already works for remote/self-paced delivery - student-driven
provisioning, cohort-less students, idle-reaper-destroy-then-continue -
and the one real gap: student authentication, explicitly Phase 5 scope,
not built here).

Updated PRODUCTION_NETWORK_SECURITY.md (the Gateway-to-Lab gap is now
RESOLVED, with the full design writeup and a new control-plane-vs-data-plane
section), PRODUCTION_DEPLOYMENT.md (four-cert TLS bundle),
PRODUCTION_VALIDATION_CHECKLIST.md (Router mTLS check, admission control
checks), PHASE4_PRODUCTION_INFRASTRUCTURE.md and ENGINEERING_SOP.md and
LAB_ARCHITECTURE.md (stale 'known gap' pointers updated to point at the
resolution), BACKUP_DR.md (destructive drill), README.md and
platform/README.md (Phase 4.1 pointers, lab-router component, updated
known-limitations).

Also fixes a real pre-existing bug found while auditing what gets
committed: infra/.gitignore's patterns were written repo-root-relative
(e.g. "infra/terraform/...") but the file lives in infra/, so git resolved
them relative to THAT directory and none of them ever matched anything -
a real .terraform/ provider cache showed up as untracked when it should
have been ignored. Fixed by dropping the redundant leading "infra/" from
every pattern.

Status: PHASE 4.1 COMPLETE / PRE-PRODUCTION HARDENING COMPLETE / READY FOR
HARDWARE DEPLOYMENT.
2026-08-24 20:16:20 -05:00