1 Commits
Author SHA1 Message Date
ced4568 0b2303a3e2 docs(phase10): canonical state audit, secrets inventory, production/security/launch readiness
Gate 1 — canonical state audit: this workstation's HEAD/origin/main and every claimed milestone
SHA (Phase 2A through 9.1) verified consistent; no stranded branches/tags on Gitea; full-history
secret scan clean (no rotation required); Phase 9.5 confirmed absent from canonical history
(pricing was given directly by Chase and used without it); second-PC reconciliation commands
provided since this session cannot see that machine.

Gate 3 — secrets: real inventory derived from process.env greps across every service (not
guessed); Infisical auth fixed (wrong domain was the actual root cause of Phase 9.1's failures —
the identity belongs to infisical.cedshomelab.com, not app.infisical.com) but no RootNode
Academy project exists there yet, contradicting this phase's own authorization — flagged for
Chase to create.

Gates 4-9/15-16 — production: verified, not assumed, that no dedicated server/Proxmox VM has
been provisioned (empty terraform.tfvars, no state file, placeholder group_vars/production.yml)
— IaC validated (tofu validate, ansible --syntax-check both clean) and left unexecuted per this
phase's own 'do not fake production deployment' instruction. rootnodeacademy.com confirmed live
(Cloudflare, real HTTPS) — the separate, not-RootNode-owned website; no Platform API subdomain
exists yet.

Gate 18 — security audit: full review against every regression suite rerun this phase; no
launch-critical defect found.

Gates 19/20 — full regression (131 checks: e2e-phase5b/5c/6f/7/8/9, content validation,
migrations, frontend build) and the Winter Break commerce rehearsal, both rerun clean against
current main.

Gates 10-14/21 — website integration, Winter Break pricing (99/49, real, Stripe-validated),
agreements/legal, tax, and refund policy all reviewed; legal text/tax/refund policy/dates/venue/
capacity correctly left as open owner decisions, not invented.

No application code changed this phase — audit/launch-prep only.
2026-08-28 12:07:25 -05:00