# Winter Break Camp Operations Phase 8 §29 — how to actually run the Winter Break Linux & Systems Foundations Camp (`docs/WINTER_BREAK_CAMP_CURRICULUM_OPTIONS.md` Option A) using the platform built in Phases 7-8, end to end, entirely from `/admin`. No payment step exists yet — this document covers everything up to and including the point where a real payment/checkout would plug in. ## What already exists vs. what Chase still fills in **Already representable, real, tested:** - The curriculum package (ROOT 01-02, referencing the real, unmodified courses). - The offering itself, in DRAFT, with delivery mode `camp`. - Registration → guardian/adult → agreement → (simulated) confirmation → enrollment → cohort → activation → classroom → real Lab work, proven end to end in `infra/scripts/drills/test-phase8-winter-camp-registration.js` (12/12 passing). **Still genuinely unknown, deliberately left editable, never invented by this phase:** - Exact dates, venue, real capacity, and price. - The actual agreement text (a plain-language placeholder only — see `docs/ STUDENT_GUARDIAN_DATA_MODEL.md`'s legal-review list). - Whether registration opens before or after a specific marketing push. ## The operational sequence 1. **Create the location** — `/admin` → Offerings → (via the offering create form's location dropdown) or directly if a location admin surface is added later; today, an admin/owner uses `POST /api/admin/locations` (documented in `docs/OFFERING_ADMIN_GUIDE.md`) once the real venue is known. 2. **Create the curriculum package** — `winter-linux-systems-v1`, referencing `root-01-computing-linux-foundations` and `root-02-linux-administration-networking` in sequence. This step is a one-time setup — the same package can back every future Winter Break Camp offering. 3. **Create the cohort** and **the offering** — delivery mode `camp`, referencing the program, the curriculum package, and (once known) the location and capacity. 4. **Assign the lead instructor** — both at the offering level (`instructor_offerings`, Phase 7) and the cohort level (`cohort_instructors`, unchanged since Phase 2A) — the offering detail page's own instructor step, or the two admin routes directly. 5. **Configure the required agreement(s)** — create the agreement definition (title + plain- language summary) and link it to the offering. **The actual legal text still needs professional review before this camp is opened to real families** — see below. 6. **Check launch readiness** — the offering detail page's readiness panel should show every check green before publishing. If instructor/curriculum/agreements are configured but dates/ location/capacity aren't final yet, readiness will honestly show that. 7. **Publish, then open registration** — `draft → published → enrollment_open`. Only once `enrollment_open` does the offering appear in the public offerings API and accept real registrations. 8. **Registrations arrive** — via the website integration (once wired — see `docs/WEBSITE_ENROLLMENT_INTEGRATION.md`'s documented future flow) or entered directly by an admin for a phone/in-person sign-up. 9. **Guardian/adult completes the agreement** — recorded via the registration's own agreement acceptance action. 10. **Payment step (future, not built)** — this is the one step this phase does not implement. Today, an admin manually transitions a registration to `confirmed` once payment is verified by whatever process exists outside the platform; a future phase's real payment integration would do this automatically on a verified commerce event, the same shape `/api/integrations/enrollments` already uses for direct program enrollment. 11. **Convert to enrollment** — creates the real student account (or matches an existing one), the real academic enrollment, and real cohort membership. 12. **Account activation** — the student's (or, for a minor, the guardian's) real one-time activation token, delivered the same way every other RootNode activation email already is. 13. **Classroom day** — Prepare Labs for the cohort, start the classroom session, students join and work through real ROOT 01-02 content and Labs. 14. **Offering completion** — `in_progress → completed` once the camp concludes. ## Known blockers before this can actually open to the public - Real dates, venue, capacity, and price are not yet decided (this document does not invent them). - The agreement text requires professional legal review (see `docs/ STUDENT_GUARDIAN_DATA_MODEL.md`). - No payment processing exists — step 10 above is manual until a future phase builds it. - The website's own registration UI does not exist yet in this repository (rootnodeacademy.com is built separately) — the integration contract it needs is ready (`docs/WEBSITE_ENROLLMENT_INTEGRATION.md`), but nobody has built the website-side form yet.