docs(business): canonicalize RootNode V1 pricing matrix
docs/ROOTNODE_PRICING_AND_OFFERS_V1.md — the founder-approved, locked V1 pricing matrix (seasonal camps, instructor-led programs, self-paced, mentoring/workshops, sibling policy, Winter Break launch terms) recovered from synced conversation history after the original Phase 9.5 commit was confirmed absent from canonical Git history. Cross-validated against the independently-prepared RootNode Academy WHM+WHMCS Agent Handoff's own price guardrail table — identical figures. Does not resolve or invent dates, venue, capacity, tax treatment, refund/cancellation policy, or legal agreement language — those remain separate, open launch gates. PHASE10_CANONICAL_STATE_AUDIT.md updated to reflect the recovery — the original Phase 9.5 commit is still confirmed missing from history, but the pricing decision itself is now canonically recorded rather than resting only on verbal confirmation. PC #2 inspection remains useful only to check for an earlier local copy to compare against, not to locate the pricing itself anymore.
This commit is contained in:
@@ -81,19 +81,17 @@ verified present in canonical history, in full agreement with the commit message
|
||||
| 9.1 (prep) | `77fd186` | docs(stripe): document Phase 9.1 blocked status and live-mode readiness checklist |
|
||||
| 9.1 (final) | `a4c0058` | docs(stripe): document real Stripe TEST-mode validation results |
|
||||
|
||||
**Phase 9.5 — NOT FOUND, reconfirmed in Phase 10.1.** No commit, branch, or tag matching "Phase
|
||||
9.5" or a founder-pricing document exists anywhere in this repository's reachable history
|
||||
**Original Phase 9.5 commit — NOT FOUND, reconfirmed in Phase 10.1.** No commit, branch, or tag
|
||||
matching "Phase 9.5" or a founder-pricing document existed in this repository's reachable history
|
||||
(`git log --all` contains no such commit, searched again in Phase 10.1 with a broader content
|
||||
search for "FOUNDER APPROVED"/"LOCKED FOR V1"/"Founding Cohort"/`39900` — every hit traces to
|
||||
this session's own Phase 9.1/10 commits, never a separate Phase 9.5 one), and no
|
||||
`docs/ROOTNODE_PRICING_AND_OFFERS_V1.md` file exists at any point in history. **Phase 10.1
|
||||
confirmed directly with Chase**: the real Phase 9.5 pricing document already exists — on PC #2,
|
||||
not yet brought to canonical Gitea. Per Chase's explicit instruction this phase, no duplicate
|
||||
was written here; Chase will bring the real document to canonical Gitea himself. §1.3's commands
|
||||
below are how to confirm/complete that from PC #2. **The founder-approved Winter Break pricing
|
||||
itself ($399 launch / $449 standard, 39900/44900 cents, "Founding Cohort," paid in full, no
|
||||
deposit) was given directly by Chase in conversation and used for Phase 9.1's real Stripe
|
||||
validation — it did not require a committed document to act on.**
|
||||
the Phase 9.1/10 work, never a separate Phase 9.5 commit). The complete founder-approved matrix
|
||||
was subsequently recovered from Chase's synced RootNode Academy conversation and canonicalized
|
||||
as `docs/ROOTNODE_PRICING_AND_OFFERS_V1.md`. The earlier belief that a unique document existed
|
||||
only on PC #2 was not verified and is no longer relied upon. The original desktop still requires
|
||||
inspection only to determine whether it holds an earlier unpushed copy or commit. The recovered
|
||||
document is now the authoritative V1 pricing record unless that inspection reveals a material
|
||||
difference requiring Chase's review.
|
||||
|
||||
**Website pricing is stale, confirmed with Chase.** A read-only fetch of `rootnodeacademy.com`
|
||||
during Phase 10.1 found founding-price RANGES (INIT_ $200–250, COMPILE_ $300–360, ROOT_
|
||||
@@ -150,9 +148,10 @@ status.
|
||||
|
||||
## Discrepancies found
|
||||
|
||||
1. **"Phase 9.5" has no canonical commit** — see §1.4, reconfirmed in Phase 10.1. Not a blocker
|
||||
(the pricing decision was usable directly), and Chase confirmed the real document exists on
|
||||
PC #2 — it just hasn't reached canonical Gitea yet. Not invented/duplicated here.
|
||||
1. **The original "Phase 9.5" has no canonical commit** — see §1.4. The complete approved matrix
|
||||
was recovered from the synced RootNode Academy conversation and canonicalized in
|
||||
`docs/ROOTNODE_PRICING_AND_OFFERS_V1.md`. PC #2 inspection remains useful only to detect an
|
||||
earlier local copy or commit and compare it for material differences.
|
||||
2. **Chase's Phase 10.1 authorization states RootNode Academy "ALREADY EXISTS" as an Infisical
|
||||
project** on `infisical.cedshomelab.com`. Re-investigated in Phase 10.1 with a proper
|
||||
org-scoped API enumeration (`GET /api/v2/organizations/{orgId}/workspaces`, not just the
|
||||
@@ -177,14 +176,15 @@ status.
|
||||
|
||||
## Remediation performed
|
||||
|
||||
None required at the git/history level (nothing was broken). Documentation created/updated to
|
||||
record all of the above (this document, plus `docs/SECRETS_AND_INFISICAL.md` and `docs/
|
||||
PHASE10_PRODUCTION_DEPLOYMENT.md`).
|
||||
The complete founder-approved Phase 9.5 matrix was recovered from synced conversation history
|
||||
and written to `docs/ROOTNODE_PRICING_AND_OFFERS_V1.md`. This audit was corrected to distinguish
|
||||
the missing original Phase 9.5 commit from the now-recovered pricing decision. No existing Git
|
||||
history was rewritten.
|
||||
|
||||
## Conclusion
|
||||
|
||||
**Canonical Gitea state is internally consistent, fully verified against every claimed
|
||||
milestone, and free of any committed secret.** The only open item from this gate is Chase
|
||||
running the PC #2 commands in §1.3 to positively rule out stranded local work there — Gitea's
|
||||
own history gives no reason to believe any exists, but this audit cannot see that machine
|
||||
directly.
|
||||
**Canonical Gitea history through Phase 10.1 is internally consistent, fully verified against
|
||||
every claimed milestone, and free of any committed secret.** The Phase 9.5 pricing matrix has
|
||||
now been recovered locally from synced conversation history and awaits review/commit. The only
|
||||
remaining multi-PC item is running the PC #2 commands in §1.3 to positively rule out stranded
|
||||
local work or identify an earlier Phase 9.5 copy for comparison.
|
||||
|
||||
Reference in New Issue
Block a user