docs(phase6d): document the ROOT Foundations milestone
Adds PHASE6D_ROOT_FOUNDATIONS.md (the phase's own record: the generic-scenario-engine finding, the tested container-runtime decision, what was authored, the bugs found and fixed, and honest test/regression/rehearsal results) and ROOT_FOUNDATIONS_PILOT_READINESS.md (module-by-module READY/DEFERRED classification for ROOT 01-04 against the unchanged Phase 6C readiness standard — ROOT 01 READY, ROOT 02-04 DEFERRED by design). Adds ROOT_PROGRAM_DURATION_MODEL.md — real per-course instructional-hour totals computed from actual estimated_duration_minutes values (2,931 minutes / 48.9 hours across all authored content), not invented, with an explicit note on why instructor-led timing isn't a separate summable field yet. Updates ROOT_PROGRAM_ARCHITECTURE.md (ROOT 01's new READY status and the real 01-04 prerequisite chain), ROOT_PILOT_CURRICULUM.md (ROOT 01 added to the pilot, module-level detail), and ROOT_CURRICULUM_COVERAGE_MATRIX.md (updated module/scenario totals) to reflect what Phase 6D actually built, without restating Phase 6C's own Kubernetes-scenario tables. Co-Authored-By: Claude Sonnet 5 <[email protected]>
This commit is contained in:
@@ -7,6 +7,17 @@ for each placement (not coverage-percentage padding). Built from
|
||||
more of demonstration/guided-exercise/reflection), **PLANNED** (structure only, no content),
|
||||
**GAP** (no suitable scenario exists at all).
|
||||
|
||||
## Phase 6D addition
|
||||
|
||||
Phase 6D authored ROOT 01 (Computing & Linux Foundations) in full — 6 modules, 35 activities, 6
|
||||
new hands-on Linux scenarios plus 2 MCQs, all READY. This is the program's first course outside
|
||||
the Kubernetes/CKS content this matrix was originally scoped to, so it is documented separately
|
||||
in `docs/ROOT_FOUNDATIONS_ARCHITECTURE.md` and `docs/PHASE6D_ROOT_FOUNDATIONS.md` rather than
|
||||
folded into the tables below, which remain the ROOT 05+ (Kubernetes) scenario-coverage record.
|
||||
Post-Phase-6D totals: **28 modules total across all courses with any content — 22 READY, 6
|
||||
PARTIAL** (Phase 6C's 22 modules — 16 READY, 6 PARTIAL — plus 6 new ROOT 01 modules, all READY).
|
||||
**106 scenario files** (98 + 8 new).
|
||||
|
||||
## Phase 6C verification (superseding Phase 6B's own self-reported counts)
|
||||
|
||||
Baseline (start of Phase 6C), run directly against the database and filesystem
|
||||
|
||||