docs(phase6e): document the ROOT Foundations Completion milestone

Adds PHASE6E_ROOT_FOUNDATIONS_COMPLETION.md (the phase's own record: what was authored, the
dash-vs-bash scenario bug found and fixed, the pre-existing lock-enforcement gap found and
fixed, the regression fallout that fix revealed in earlier suites and why each was a stale test
assumption rather than a platform bug, and honest test/rehearsal/regression results).

Updates ROOT_FOUNDATIONS_PILOT_READINESS.md (full re-audit: all 4 ROOT Foundations courses now
READY, not inherited blindly from Phase 6D), ROOT_PROGRAM_DURATION_MODEL.md (real ROOT 02-04
duration data: 24.7 combined hours, landing inside Phase 6D's own estimated range; 67.9 hours
across the full authored program), ROOT_PILOT_CURRICULUM.md (ROOT 02-04 move from NOT IN PILOT
to IN PILOT with full module-level detail; the pilot is now genuinely self-paced-capable for the
entire foundational half, not just instructor-led), ROOT_PROGRAM_ARCHITECTURE.md and
ROOT_CURRICULUM_COVERAGE_MATRIX.md (course/module/scenario totals), and
ROOT_FOUNDATIONS_ARCHITECTURE.md (marked as-built, not just as-designed).

Co-Authored-By: Claude Sonnet 5 <[email protected]>
This commit is contained in:
2026-08-26 17:09:02 -05:00
co-authored by Claude Sonnet 5
parent 59edceea1f
commit 87ad1251ce
7 changed files with 357 additions and 110 deletions
+19 -3
View File
@@ -14,9 +14,25 @@ new hands-on Linux scenarios plus 2 MCQs, all READY. This is the program's first
the Kubernetes/CKS content this matrix was originally scoped to, so it is documented separately
in `docs/ROOT_FOUNDATIONS_ARCHITECTURE.md` and `docs/PHASE6D_ROOT_FOUNDATIONS.md` rather than
folded into the tables below, which remain the ROOT 05+ (Kubernetes) scenario-coverage record.
Post-Phase-6D totals: **28 modules total across all courses with any content — 22 READY, 6
PARTIAL** (Phase 6C's 22 modules — 16 READY, 6 PARTIAL — plus 6 new ROOT 01 modules, all READY).
**106 scenario files** (98 + 8 new).
Post-Phase-6D totals: 28 modules total across all courses with any content — 22 READY, 6
PARTIAL (Phase 6C's 22 modules — 16 READY, 6 PARTIAL — plus 6 new ROOT 01 modules, all READY).
106 scenario files (98 + 8 new).
## Phase 6E addition
Phase 6E authored ROOT 02 (Linux Administration & Networking, 6 modules, 37 activities), ROOT 03
(Git & Collaborative Development, 6 modules, 31 activities), and ROOT 04 (Containers & Docker, 8
modules, 43 activities) in full — completing the entire ROOT_ Foundations sequence
(ROOT 01-04). See `docs/PHASE6E_ROOT_FOUNDATIONS_COMPLETION.md` and
`docs/ROOT_FOUNDATIONS_PILOT_READINESS.md`. 20 new hands-on/MCQ scenarios (6 Linux task + 2
Linux MCQ, 3 Git task + 2 Git MCQ, 5 Docker task + 2 Docker MCQ).
**Post-Phase-6E totals: 48 modules total across all courses with any content — 42 READY, 6
PARTIAL** (unchanged PARTIAL set: root-06-m01, root-07-m01, root-08-m01, root-08-m02,
root-10-m02, root-11-m01 — none touched by this phase). **126 scenario files** (106 + 20 new).
The entire ROOT_ program now has a complete, READY, real path from Computing & Linux
Foundations through the Capstone, excluding only the explicitly-deferred ROOT 08 and ROOT 11
modules 2-7 — see `docs/ROOT_PILOT_CURRICULUM.md`.
## Phase 6C verification (superseding Phase 6B's own self-reported counts)