docs(phase6b): document curriculum expansion
PHASE6B_ROOT_CURRICULUM_EXPANSION.md — the phase summary: what was authored per course, the is_required extension, the capstone unlock fix, verified scenario coverage before/after (44 -> 88 of 98, 89.8%, by direct query not estimate), and honest known limitations/Phase 6C recommendations. ROOT_CAPSTONE_READINESS.md — the readiness module and the server-side unlock fix in full detail, including why the module's completion and the real assessment's unlock gate are deliberately independent systems. Updated ROOT_CURRICULUM_INVENTORY.md (Phase 6B coverage numbers), ROOT_PROGRAM_ARCHITECTURE.md (ROOT 08/09 PARTIAL, new module lists per course), COURSE_CONTENT_MODEL.md (is_required completion rule, a new content-versioning section per this phase's own requirement), COURSE_AUTHORING_STANDARD.md (classifying near-duplicate/advanced scenarios), ENGINEERING_SOP.md (new Phase 6B section), REMOTE_AND_SELF_PACED_ARCHITECTURE.md (cross-reference), and platform/README.md (e2e-phase6b.js, the Phase 6B rehearsal, isolation- per-suite regression guidance). Co-Authored-By: Claude Sonnet 5 <[email protected]>
This commit is contained in:
@@ -207,3 +207,15 @@ ROOT 07/08/09/10 can draw on in Phase 6B, not content that needs to be invented:
|
||||
- No DevOps/CI/CD/IaC/GitOps scenario content exists (ROOT 11 is necessarily 100% PLANNED).
|
||||
- No Linux-fundamentals, Git, or Docker-specific scenario content exists (ROOT 01-04 are
|
||||
necessarily 100% PLANNED) — everything in `scenarios/data/` is Kubernetes/CKS content.
|
||||
|
||||
## 8. Phase 6B update — scenario coverage after curriculum authoring
|
||||
|
||||
Phase 6B wired 44 more of the scenarios above into structured curriculum (verified by direct
|
||||
query against `module_activities.scenario_id`, not estimated): **88 of 98 scenarios (89.8%)**
|
||||
are now in structured curriculum, up from 44 at the end of Phase 6A. The remaining 10 —
|
||||
`cluster-upgrade-mcq`, `etcd-backup-mcq` (ROOT 11 territory), 7 CKS-style MCQs classified as
|
||||
future ASSESSMENT BANK material, and `readiness-probe-task` (a genuine, documented gap for
|
||||
Phase 6C) — are listed with their specific reasons in
|
||||
`docs/PHASE6B_ROOT_CURRICULUM_EXPANSION.md` §5. The full course-by-course mapping, including
|
||||
which scenarios were classified CORE/GUIDED/INDEPENDENT/ADVANCED/ASSESSMENT-BANK and why, lives
|
||||
in `docs/ROOT_CURRICULUM_COVERAGE_MATRIX.md` — this file is intentionally not duplicated there.
|
||||
|
||||
Reference in New Issue
Block a user